Quote:
Originally Posted by sam
We are putting up wainescoating to the thin backer board in our hallway that leads to our basement. Should take at least a month for me to stain and put three coats of tung oil on everything. I have ten packages to do. Then DH can install. We have two other areas in our home where we have wainescoating.
|
Sam,
To name a few winter projects:
*Finish sanding and painting the camper shell.
*Remove HiLo cabinests, repair bad sections of ceiling panels, remove outer skin of existing ceiling panels, then glue [4] 4'x8' ceiling panels to existing ceiling and paint.
*Completely remove everything from work shop, remove peg board, fill in cracks and paint the walls, install several feet of shelving using 1"x12" boards from ceiling to floor. Paint two work benches.
I may also install a radio in the HiLo and add a TV outlet to the little outside dropdown workstation.
That should keep me occupied this winter!
Happy New Year to Sam and all our Forum Friends!
Jerry & Carol Curtis
Fredericksburg, TX
2406 T
__________________