Hi all. Dug in today and here is the status so far. First some pics.
The damage appears to be mainly isolated to the front left lower section. I spent this morning lifted ng the left side enough to get to what I needed to. I removed the guide rails and supporting it front and rear lifted it slowly while ensuring the guides cleared the lower section trim so nothing was damaged on the way up. Removed both windows on the left side and found the foam intact with some of the interior trim wood damaged below both windows and the entire beam of the lower top damaged from the fridge cutout forward. The metal frame while somewhat Rusty is solid. So basically today was demolition. I measured the lower wood as 2 3/4"pieces of plywood and a 1/8 finishing layer attached to the lower wall. Above that there is some wiring. So I knocked all that out and using a new multitool I carefully sliced the inner plywood laayer up high enough to be free of water damage. Luckily my roof is great so no damage from about 1/4 of the way up from the windows to the roof.
So now working on peel in all that old plywood off. The stuff that was wet came off pretty easily but the stuff that wasn't in bad shape sure doesn't want to let go. Any suggestions? I guess so far putty knife and lots of elbow work. Also the lower beam below the kitchen window is semi soft at the top but still pretty solid on the bottom edge. Anyone cut this away partially and just laid a new top half on it? Or should I leave well enough alone lol. The wall still seems quite solid as the metal is strong and still in place. So at this point it's mainly just closing out the edge near as I can tell so if I clean it up and recap it I'm guessing it will be fine with resealed windows.
The damage appears to be mainly isolated to the front left lower section. I spent this morning lifted ng the left side enough to get to what I needed to. I removed the guide rails and supporting it front and rear lifted it slowly while ensuring the guides cleared the lower section trim so nothing was damaged on the way up. Removed both windows on the left side and found the foam intact with some of the interior trim wood damaged below both windows and the entire beam of the lower top damaged from the fridge cutout forward. The metal frame while somewhat Rusty is solid. So basically today was demolition. I measured the lower wood as 2 3/4"pieces of plywood and a 1/8 finishing layer attached to the lower wall. Above that there is some wiring. So I knocked all that out and using a new multitool I carefully sliced the inner plywood laayer up high enough to be free of water damage. Luckily my roof is great so no damage from about 1/4 of the way up from the windows to the roof.
So now working on peel in all that old plywood off. The stuff that was wet came off pretty easily but the stuff that wasn't in bad shape sure doesn't want to let go. Any suggestions? I guess so far putty knife and lots of elbow work. Also the lower beam below the kitchen window is semi soft at the top but still pretty solid on the bottom edge. Anyone cut this away partially and just laid a new top half on it? Or should I leave well enough alone lol. The wall still seems quite solid as the metal is strong and still in place. So at this point it's mainly just closing out the edge near as I can tell so if I clean it up and recap it I'm guessing it will be fine with resealed windows.